Atlantis Go

T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/










T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/








T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/







T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準備、キャンプアウト(パトリック・フォレスター、スティーブン・スワンソン両宇宙飛行士)

6日目 P6トラスの右舷側SAWの収納
第2回船外活動

7日目 P6トラスの右舷側SAWの収納
スペースシャトルのTPSの損傷点検(必要になった場合のみ実施)
クルーの休息
第3回船外活動の準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

8日目 電力系統1、4の停止
第3回船外活動
カナダアーム2のモービルベースシステム(MBS)から「デスティニー」(米国実験棟)への移動

9日目 物資の移送
クルーの休息
軌道上共同記者会見
スペースシャトル/ISS間のハッチ閉

10日目 ISSからの分離
フライアラウンド
OBSSを使用した両翼とノーズキャップのRCC検査

11日目 飛行制御システム(Flight Control System: FCS)の点検
姿勢制御システム(Reaction Control System: RCS)の点検
船内の片づけ
軌道離脱準備
Kuバンドアンテナ収納

12日目 軌道離脱準備
ペイロードベイのドア閉
軌道離脱
着陸
飛行スケジュール: 国際宇宙ステーションの組立フライト 13A(STS-117) - 宇宙ステーション・きぼう広報・情報センター - JAXA
http://iss.jaxa.jp/iss/13a/mission/overview/schedule/



T-9 minutes and counting
Start automatic ground launch sequencer
Retract orbiter access arm (T-7 minutes, 30 seconds)
Start auxiliary power units (T-5 minutes, 0 seconds)
Arm solid rocket booster range safety safe and arm devices (T-5 minutes, 0 seconds)
Start orbiter aerosurface profile test, followed by main engine gimbal profile test (T-3 minutes, 55 seconds)
Retract gaseous oxygen vent arm, or "beanie cap"
(T-2 minutes, 55 seconds)
Crew members close and lock their visors
(T-2 minutes, 0 seconds)
Orbiter transfers from ground to internal power
(T-50 seconds)
Ground launch sequencer is go for auto sequence start (T-31 seconds)
Activate launch pad sound suppression system
(T-16 seconds)
Activate main engine hydrogen burnoff system
(T-10 seconds)
Main engine start (T-6.6 seconds)

T-0
Solid rocket booster ignition and liftoff!
http://www.nasa.gov/mission_pages/launch/countdown101.html

アトランティス」 エンジン一基 不調でした(^_^;)

NASA - NASA's Launch Blog - Mission STS-117

Main engine cutoff and jettison of the external tank! Atlantis has reached orbit and Commander Rick Sturckow has confirmed a good separation.

7:41 p.m. - Atlantis' solid rocket boosters have separated and fallen away from the orbiter.
7:38 p.m. - 3…2…1…and Liftoff of Space Shuttle Atlantis, to assemble the framework for the science laboratories of tomorrow!
"7:29 p.m. - The countdown is at T-9 minutes and counting. As the count resumes, the GLS will be in control of all critical space shuttle launch operations and there are several milestones before launch at 7:38. They include:
At T-16 seconds, the launch pad's water sound suppression system begins flooding the mobile launcher platform with 300,000 gallons of water. The system protects the shuttle and its payload from any damage caused by energy generated during launch.
At T-10 seconds, flares ignite under Atlantis' three main engines to burn away any residual hydrogen that may have collected near the main engine nozzles.
At T-6.6 seconds, the main engines will begin firing in anticipation of liftoff.

7:28 p.m. - The orbiter's "black boxes" are now in the recording mode and will continue to collect data about the performance of the shuttle systems during the flight.
7:24 p.m. - Launch Director Mike Leinbach is performing the poll to determine a "go/no-go" for launch. The team is a go! He wished the Atlantis crew members good luck and Godspeed.
7:14 p.m. - The countdown clock is holding at T-9 minutes. The final prelaunch polls soon will be taking place. "
http://www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts117/launch/index_Launch-blog.html

◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆ ◆
Aug. 9 STS-118
STS-118 will deliver the S5 Truss and will be the twenty-second mission to the International Space Station.

Oct. 20 STS-120
STS-120 will be the twenty-third mission to the International Space Station and deliver the U.S. Node 2.

Dec. 6 STS-122
STS-122 will deliver the Columbus European Laboratory Module and will be the twenty-fourth mission to the International Space Station.

Date/2008
Feb. 14 STS-123
Mission STS-123 on Space Shuttle Endeavour will deliver the pressurized section of the Kibo Japanese Experiment Logistics Module (ELM-PS) on the twenty-fifth mission to the International Space Station.

April 24 STS-124
Space Shuttle Discovery on mission STS-124 will transport the Kibo Japanese Experiment Module - Pressurized Module (JEM-PM) and the Japanese Remote Manipulator System (JEM RMS) to the International Space Station.
http://www.nasa.gov/missions/highlights/schedule.html

飛行スケジュール
最終更新日:2007年6月1日
13A(STS-117)ミッション飛行スケジュール 飛行日(*1) 主な実施ミッション
1日目 打上げ/軌道投入
分離後の外部燃料タンク(External Tank: ET)の撮影
ペイロードベイ(貨物室)のドアのオープン
Kuバンドアンテナ展開
スペースシャトルのロボットアーム(SRMS)の起動
撮影したETの画像および翼前縁衝突センサデータの地上への送信

2日目 SRMSの点検
SRMSによるセンサ付き検査用延長ブーム(Orbiter Boom Sensor System: OBSS)の把持
機体の熱防護システム(Thermal Protection System: TPS)、主翼前緑の強化炭素複合材(Reinforced Carbon Carbon: RCC)の損傷点検
OBSSの格納
宇宙服(EMU)の点検
ドッキングシステム(Orbiter Docking System: ODS)のドッキングリングの伸展
エアロックの準備
ランデブに向けた軌道制御

3日目 ランデブに向けた軌道制御
ランデブ・ピッチ・マヌーバ(Rendezvous Pitch Maneuver: RPM)を実施して、国際宇宙ステーションISS)からスペースシャトルのTPSを撮影
ISSとのドッキングおよび入室
SRMSから「カナダアーム2」(ISSのロボットアーム)へS3/S4トラスの受け渡し
第1回船外活動準備、キャンプアウト(ジェイムズ・ライリー 、ジョン・オリバース両宇宙飛行士)

4日目 カナダアーム2によるS1トラスへのS3/S4トラスの取付け
第1回船外活動
S3/S4トラスの起動

5日目 S4トラスの太陽電池パドル(Solar Array Wing: SAW)の展開
第2回船外活動の準