STS-129 Atlantis: Launch

STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/











STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/









STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/








STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/




STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS handoff of ELC2 to Canadarm2
ELC2 installation on S3 upper outboard
attachment point
Spacewalk 2 by Foreman and Bresnik
(GATOR ham radio equipment installation
on Columbus, Floating Point Measurement
Unit relocation, S3 truss nadir payload
attachment system deployment, camera
wireless system installation on S3 truss)
MRM2 thermal control system activation


Flight Day 7
Crew off duty time
Spacewalk 3 procedure review
Spacewalk 3 campout in Quest airlock by
Satcher and Bresnik


Flight Day 8
Spacewalk 3 by Satcher and Bresnik
(Transfer of High Pressure Oxygen Gas
Tank and MISSE 7 to Quest, S3 nadir
payload attachment system deploy,
jettisoning of MMOD shields)
10 TIMELINE OVERVIEW NOVEMBER 2009


Flight Day 9
Joint Crew News Conference
Crew off duty time
Farewells and hatch closure
Rendezvous tools checkout


Flight Day 10
Atlantis undocking from ISS PMA-2
Flyaround of ISS and final separation
Late inspection of Atlantis’ thermal
protection system with the OBSS


Flight Day 11
Flight Control System Checkout
Reaction Control System hot-fire test
Crew Deorbit Briefing
Cabin Stowage
Recumbent Seat Setup for Stott


Flight Day 12
Deorbit preparations
Payload Bay Door closing
Deorbit burn
KSC Landing






TOP500 Supercomputing Sites | November 2009 (1-100)
http://www.top500.org/list/2009/11/100
1. Oak Ridge National Laboratory Jaguar - Cray Inc.
2. DOE/NNSA/LANL Roadrunner - BladeCenter IBM
3. National Institute for Computational Sciences/University of Tennessee Cray XT5-HE Opteron Six Core 2.6 GHz Cray Inc.
4. Forschungszentrum Juelich (FZJ) Germany JUGENE - Blue Gene/IBM
5 National SuperComputer Center in Tianjin/NUDT China
Tianhe-1 - NUDT TH-1 Cluster, Xeon E5540/E5450, ATI Radeon HD 4870 2, Infiniband / 2009 NUDT



1.オークリッジ国立研究所のCray製Jaguar(1.75ペタFLOPS)
2.ロスアラモス国立研究所IBM製Roadrunner(1.04ペタFLOPS)
3.米計算科学研究所(NICS)のCray製Kraken XT5(832テラFLOPS)
4.ユーリヒ総合研究機構のIBM製JUGENE(825.5テラFLOPS)
5.天津国立スーパーコンピュータセンターのNUDT製Tianhe-1(563.1テラFLOPS) スパコントップ500、クレイの「Jaguar」が首位に--- CNET
http://japan.cnet.com/news/ent/story/0,2000056022,20403670,00.htm


世界最速スパコン:景気刺激策で新研究を支援する米政府 | WIRED
http://wiredvision.jp/news/200911/2009111823.html
スパコン:約4万のチップを1週間でアップグレード | WIRED
http://wiredvision.jp/news/200911/2009111822.html




STEINS;GATE
運命石の扉 Steins;Gateシュタインズ・ゲート公式サイト
http://steinsgate.jp/sgflash.html
これが運命石の扉神ゲー”かも。「Steins;Gate(シュタインズ・ゲート)」レビュー4Gamer.net
http://www.4gamer.net/games/098/G009802/20091107001/
Steins;Gateシュタインズ・ゲート)」がまさかの首位奪取!?
"アドベンチャーゲームの亜種として誕生しながらも,独自の進化の道を歩んできたノベルゲーム。その一つの到達点ともいえる本作"
http://www.4gamer.net/games/098/G009802/20091109002/
アニメ、ゲーム音楽の饗宴に「Live 5pb. 2009 マイコミジャーナル
http://journal.mycom.co.jp/articles/2009/11/14/live5pb2009/
STEINS;GATE EDテーマ「運命のファルファッラ」
http://journal.mycom.co.jp/news/2009/11/13/006/?rt=m&t=o&n=2910


FALLOUT3
http://www.youtube.com/watch?v=V16MU5f283A
"released in North America on October 28, 2008"
http://en.wikipedia.org/wiki/FALLOUT3


Moon Town by Steve Ogden - Luna Ville 031-040
http://moon-town.com/comic/luna-ville-031-040/





STS-129 Atlantis: Nov. 16


Launch Time: 2:28 p.m. EST 日本時間17日4時28分
STS-129/Atlantis/ULF3 launch (ELC1, ELC2)







STS-129 TIMELINE OVERVIEW


Flight Day 1
Launch
Payload Bay Door Opening
Ku-Band Antenna Deployment
Shuttle Robotic Arm Activation and
payload bay survey
Umbilical Well and Handheld External
Tank Photo and TV Downlink


Flight Day 2
Atlantis’ Thermal Protection System Survey
with Shuttle Robotic Arm/Orbiter Boom
Sensor System (OBSS)
Extravehicular Mobility Unit Checkout
Centerline Camera Installation
Orbiter Docking System Ring Extension
Orbital Maneuvering System Pod Survey
Rendezvous tools checkout
Shuttle RMS grapple of ELC1 in payload
bay


Flight Day 3
Rendezvous with the International Space
Station
Rendezvous Pitch Maneuver Photography
of Atlantis’ Thermal Protection System by
Stott and Williams of the Expedition 21
crew
Docking to Harmony/Pressurized Mating
Adapter-2
Hatch Opening and Welcoming (Stott
becomes a Shuttle crewmember at hatch
opening; no crew exchange)
Shuttle RMS unberth and handoff of ELC1
to Canadarm2
Installation of ELC1 on P3 truss lower
outboard attachment point
Cargo transfer from MRM2 to ISS
Spacewalk 1 procedure review
Spacewalk 1 campout in Quest airlock by
Foreman and Satcher


Flight Day 4
Spacewalk 1 by Foreman and Satcher
(installation of spare S-band antenna
assembly on Z1 truss, routing of cables for
the Space to Ground Antenna, lubrication of
the Payload Orbital Replacement System
Attachment on the Mobile Base System and
the end effector of the Kibo robotic arm,
cable preparations for STS-130)


Flight Day 5
Canadarm2 grapple of OBSS and handoff to
Shuttle RMS
Focused inspection of Atlantis’ thermal
protection system with the OBSS
Spacewalk 2 procedure review
Spacewalk 2 campout in Quest airlock by
Foreman and Bresnik


Flight Day 6
Shuttle RMS grapple and unberth of ELC2
Shuttle RMS