ISS HTV Grapple and Berthing


The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107










The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107








The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107







The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107





The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107









The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107










The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107








The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107







The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107





The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107








The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107










The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them being very close to absolute zero (–273.15°C, or zero Kelvin, 0K)"
http://www.universetoday.com/2009/09/17/planck-first-light/



LRO Early Results Press Conference Visuals
http://www.nasa.gov/mission_pages/LRO/news/south_pole.html
LRO Instruments :The LRO Spacecraft, Instrument by Instrument
http://www.nasa.gov/mission_pages/LRO/spacecraft/index.html
Lunar Reconnaissance Orbiter Press Conference - GSFC


ISS Expedition 22 Crew News Conference - JSC

Expedition 22
"Soyuz TMA-17
Crew: Oleg Kotov, Soichi Noguchi, T.J. Creamer
Launch: Dec. 7, 2009"
http://www.nasa.gov/mission_pages/station/expeditions/expedition22/index.html




Asian Accelerator Plaza
http://www.aaplaza.org/a1.html

"アジア各国で進む加速器建設" KEK:News@KEK
http://www.kek.jp/newskek/2009/sepoct/AAP.html
再録
「4次元空間中性子探査装置の開発と酸化物高温超伝導機構の解明」
J-PARC中性子実験装置「四季」KEK:プレス
http://www.kek.jp/ja/news/press/2009/J-PARC_BL01_Shiki.html









お三の宮 秋まつり :ヨコハマ イセザキモール 1.2st
横浜・伊勢佐木町商店街 ISEZAKI MALL
平成21年9月18日(金)〜9月20日(日)
9月18日(金)例祭式典17:00〜、
19日(土)大神輿御巡行:
9:00〜出御・発輿祭−宮出し/20:30〜 還御・着輿祭−宮入り、
20日(日)町内神輿連合渡御
イセザキ・モールでの行事
http://www.isezaki.jp/news/news.html?id=107








The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the ISS Thursday and was grappled using the station’s robotic arm at 3:47 p.m. EDT.

ISS HTV Grapple




Japanese Cargo Craft Docked with Station
The unpiloted Japanese H-II Transfer Vehicle (HTV) arrived at the International Space Station Thursday and was attached at 6:26 p.m. EDT using the station’s robotic arm.





International Space Station Daily Report
HTV1 (H-IIB Transfer Vehicle 1) rendezvous & berthing (~3:50pm)
Arrive at Capture Point – 3:30pm
Capture Window opens (sunset) – 3:45pm
Capture & berth w/SSRMS – ~3:50pm
Capture Window closes (sunrise) – 4:20:34pm
Backup Capture & berth w/SSRMS – 5:20pm"
http://www.nasa.gov/directorates/somd/reports/iss_reports/



HTV技術実証機、ISSの後方5kmに到着(2009年09月18日)
9月17日午後6時26分および同日午後9時28分に高度調整マヌーバを実施し、同日午後10時59分にISS後方5kmの接近開始
Approach Initiation: AI点に到着"
http://iss.jaxa.jp/htv/htv1_ai.html



International Space Station Daily Report
Inspect the HTV PCBM for FOD (Foreign Object/Debris), using an internal camcorder out the Node-2 nadir CBM hatch (Stott, De Winne) -- ~4:30pm,
Install the CBCS (Centerline Berthing Camera System) at the Node-2 nadir port & power it up (Thirsk) -- ~5:40pm,
Berth & install the HTV to the Node-2 nadir port (CBM Stage 1 & Stage capture, then ABOLTS) (Stott, De Winne) -- ~6:30pm,
Ungrapple the HTV (Stott, Thirsk) -- ~8:00pm,
Grapple the EP (Exposed Pallet) in the HTV’s flank with the SSRMS (Stott, Thirsk) – 8:45pm,
Pressurize the HTV/Node-2 Vestibule (De Winne) -- ~8:45pm.
Uninstall & remove the CBCS (Thirsk) -- ~9:30pm,
Power down the two SSC laptops used for additional monitors at LAB RWS (Stott) -- ~9:40pm,
Deactivate the RWS video monitor system (Barratt) -- ~9:55pm, and
Open the Node-2/HTV hatches and start Vestibule outfitting (remove CDC/Center Disk Cover, mate a power jumper and a MIL-STD-1553 data jumper from Node-2 to HTV) (Thirsk, De Winne) – ~10:10pm."
http://www.nasa.gov/directorates/somd/reports/iss_reports/




11/2or3という話も?
10/14 JAXA HTV-1 unberth予定
"10/14/09 -- H-IIB (JAXA HTV-1) unberth (under review)"
http://d.hatena.ne.jp/yellowz/20091014



ESA - Planck - Planck first light yields promising results
http://www.esa.int/SPECIALS/Planck/SEM5CMFWNZF_0.html
Planck Snaps its First Images of Ancient Cosmic Light - NASA Jet Propulsion Laboratory
http://www.jpl.nasa.gov/news/news.cfm?release=2009-141
ESA's Planck probe starts exploration of big bang's remnant - Ars Technica
http://arstechnica.com/science/news/2009/09/esas-planck-probe-starts-exploration-of-big-bangs-remnant

Planck telescope's first glimpse | BBC NEWS
"The new images show off Planck's capabilities now that it has been set up, although major science results are not expected for a couple of years."
http://news.bbc.co.uk/2/hi/science/nature/8260711.stm

Planck Microwave Observatory's First Light Yields Promising Results
http://www.sciencedaily.com/releases/2009/09/090917111503.htm
Probe gets clearest glimpse yet of cosmic dawn - New Scientist
http://www.newscientist.com/article/dn17807-probe-gets-clearest-glimpse-yet-of-cosmic-dawn.html?DCMP=OTC-rss&nsref=space
Planck First Light | Universe Today
"In order to do its work, Planck's detectors must be cooled to extremely low temperatures, some of them bei