FD 2

05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing













05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing











05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing










05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing







05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing













05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09
Tue 06:26 AM...00...16...25...NC-2 rendezvous rocket firing
Tue 06:41 PM...01...04...40...NC-3 rendezvous rocket firing
05/13/09
Wed 09:02 AM...01...19...01...NC-4 rendezvous rocket firing
Wed 10:41 AM...01...20...40...TI rendezvous rocket firing
Wed 12:54 PM...01...22...53...HST Capture
CBS News Space Place - Space Shuttle Facts and Figures
http://www.cbsnews.com/network/news/space/currentglance.html#DOCKING





Flight Day 2
• Atlantis Thermal Protection System Survey with Orbiter Boom Sensor System
• Extravehicular Mobility Unit Checkout
• Payload Bay Flight Support System Preparations
Rendezvous Tools Checkout
• HST Aperture Door Closure
• HST Maneuver to Rendezvous and Grapple Attitude
• HST High Gain Antenna Retraction





ATLANTIS CREW WAKE UP (begins FD 2)
RMS UNBERTH OBSS
FSS PREPARATIONS FOR HST BERTHING
EMU CHECKOUT
RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS
MISSION STATUS BRIEFING
PROGRESS 33 DOCKING TO ISS
OBSS BERTH
POST-MMT BRIEFING
RMS OMS POD SURVEY
RENDEZVOUS TOOL CHECKOUT
HST APERTURE DOOR CLOSURE
ATLANTIS CREW SLEEP BEGINS
STOCC UPDATE
FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during crew sleep)












HST HGA RETRACTION

ATLANTIS CREW WAKE UP (begins FD 3)

HST RENDEZVOUS OPERATIONS BEGIN

TI BURN

HST MANEUVERS TO GRAPPLE ATTITUDE

RMS GRAPPLE OF HST

RMS BERTHS HST ON FSS IN ATLANTIS' PAYLOAD BAY

HST SURVEY BEGINS

MISSION STATUS / POST-MMT BRIEFING

EVA #1 CREW PROCEDURE REVIEW

HD VTR PLAYBACK OF HST CAPTURE & BERTH

ATLANTIS CREW SLEEP BEGINS

STOCC UPDATE

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during crew sleep)

VIDEO FILE

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (on the NASA-TV HDTV Channel; replayed 5am-8am CT May 14)






Flight Day 3
Rendezvous with the Hubble Space Telescope
• HST Solar Arrays Positioned for Grapple
• HST Grapple and Berth on Flight Support System
• Shuttle Robotic Arm Survey of HST
• EVA 1 Procedure Review


Flight Day 4
• EVA 1 by Grunsfeld and Feustel (Wide Field Camera III Installation, Science Instrument Command and Data Handling Computer, Soft Capture Mechanism Installation and Latch Over Centerline Kit Installation)
• Wide Field Camera III Aliveness Test and Checkout
• SI C&DH Aliveness Checkout
• Bay 3 Battery Checkout
• EVA 2 Procedure Review


Flight Day 5
• EVA 2 by Massimino and Good (Rate Sensor Unit Changeout and Bay 2 Battery Changeout)
• Bay 2 Battery Checkout
• Rate Sensor Unit Checkout
• EVA 3 Procedure Review


Flight Day 6
• EVA 3 by Grunsfeld and Feustel (Cosmic Origins Spectrograph replaces the Corrective Optics Space Telescope Axial Replacement known as COSTAR and the repair to the Advanced Camera for Surveys)
• Cosmic Origins Spectrograph Checkout
• ASC Checkout
• EVA 4 Procedure Review


Flight Day 7
• EVA 4 by Massimino and Good (Space Telescope Imaging Spectrograph refurbishment and New Outer Layer Blanket replacement over Bay 8)
• Space Telescope Imaging Spectrograph Checkout
• EVA 5 Procedure Review


Flight Day 8
• EVA 5 by Grunsfeld and Feustel (Bay 3 Battery Changeout, Fine Guidance Sensor-2 Replacement and New Outer Layer Blanket replacement over Bay 5)
• Fine Guidance Sensor-2 Checkout
• Bay 3 Battery Checkout
• Advanced Camera for Surveys and Wide Field Camera III Combined Checkout
• High Gain Antenna Deployment
• HST Reboost, if propellant permits • Rendezvous Tools Checkout


Flight Day 9
• HST Aperture Door Opening • Atlantis/HST Maneuver to Release Attitude
• HST Release • Atlantis Separation Maneuver • Flight Support System Stowage in Payload Bay • OBSS Unberth • OBSS Late Inspection of Atlantis Thermal Protection System


Flight Day 10
• Crew Off Duty Time
• Crew News Conference
• Atlantis/ISS Ship-to-Ship Call


Flight Day 11
• Flight Control System Checkout
• Reaction Control System Hot-Fire Test
• Cabin Stowage • Ku-Band Antenna Stowage



Flight Day 12
• Deorbit Preparations
• Payload Bay Door Closing
• Deorbit Burn
• Kennedy Space Center Landing






05/12/09